ISS Daily Summary Report – 10/29/13 – NASA https://www.nasa.gov/blogs/stationreport/2013/10/29/iss-daily-summary-report-10-29-13/
Ice Crystal-2 Troubleshooting: Flight Engineer (FE)-6 Nyberg measured the resistance of the Temperature Control Cable and Ice Cell 2 in the Solution Crystallization Observation Facility (SCOF) with a multimeter to check the conduction state prior to the reconfiguration of signal cables tomorrow. Ice Crystal-2 operations are planned to begin the week of November 18th. JAXA’s …
Monitoring Lulin-5 readings [Complete] Hand ergometry [Complete] Crew Departure